MODERNIZATION OF THE NOVÝ HRADEC KRÁLOVÉ SUBSTATION

was co-financed by the European Union.

As part of the project, the existing equipment designed to distribute electrical energy was modernized to ensure the power supply of the overhead contact line network with 600 V DC direct current in the areas of Moravské Předměstí, Nový Hradec Králové and Malšovice.